At the May hearings, the Commission found substantial issue on two projects in Redono Beach. The Sierra Club participated as an appellant. The Palos Verdes Group will be tracking these as they work their way through the appeal process and come back for de novo hearings.
Appeal No. A-5-RDB-16-0092 (Redondo Beach Waterfront, LLC, Redondo Beach) Appeal by two Redondo Beach City Councilmembers, Rescue our Waterfront and others, of the City of Redondo Beach permit for the Waterfront Revitalization Project to redevelop 36-acres of Redondo Beach King Harbor which includes demolition of 199,171 sq.ft. of commercial and office structures, pier parking structure and surface parking lot, and construction of 511,460 sq.ft. of commercial structures and 2 new parking garages; realign street and bike lanes on Harbor Dr. connecting to Pacific Ave.; open swimming lagoon to tidal action; construct new pedestrian pathway along existing revetment; reconstruction of fishing pier and etc., between the sea and Harbor Dr., from Portofino Way to Torrance Circle, Redondo Beach, Los Angeles County. (AD-LB)
Appeal No. A-5-RDB-17-0008 (City of Redondo Beach Boat Launch Facility) Appeal by two Redondo Beach City Councilmembers, Rescue Our Waterfront, and others of the City of Redondo Beach permit for construction of public boat launch facility, boat hoist, and parking at Mole B, Moonstone Park on Marina Way, Redondo Beach, Los Angeles County. (AD-LB)